On-site Risk Analysis Digitised from the PDF form Risk Analysis Onsite. Front pageOn-site risk assessment carried out before work commences.Address(Required)Place/area(Required)Is there a work environment plan? Yes No N/A 3.0. PL-nummer(Required)3.1. Date(Required) 3.1. Time Hours : Minutes 3.2. Customer Contact, telephone(Required)On-site risk analysis created by Name, role and company(Required)Participants, role and companyName, telephone, role and company(Required)Namn Namnsson, Supervisor, C2 Vertical SafetyRisk analysisRisk of falling? Yes No N/A 1.0 – Can the risk be eliminated? Yes No N/A 1.0.0 – Is the fall protection equipment inspected Yes No N/A 1.0.1 – Is there a rescue plan in place? Yes No N/A 1.0.1.0 – Responsible?1.0.2 – Is the anchoring okay? Yes No N/A 1.0.3 – Are all well acquainted with the methods to be used? Yes No N/A 1.0.4 – Wider edges? Yes No N/A 1.0.4.0 – Can they be fixed?1.0.5 – DiverseMobile working platform Yes No N/A 2.0 – Are there driving permits? Yes No N/A 2.1 – Daily check performed? Yes No N/A 2.2 – Is everyone well-acquainted with the emergency ditching procedure? Yes No N/A 2.3 – Do we need to cordon off? Yes No N/A 2.4 – Is there any risk of impact? Yes No N/A 2.4.0 – What actions are being taken?2.5 – OtherFalling objects Yes No N/A 3.0 – Can the risk be eliminated? Yes No N/A 3.1 – Is tool securing used? Yes No N/A 3.2 – Interruption during? Yes No N/A 3.3 – OtherHot work Yes No N/A 4.0 – Work Permit? Yes No N/A 4.1 – Type? Welding Kapning Grinding Roofing Open flame 4.2 – Extinguishing equipment? Yes No N/A 4.3 – PPE? Yes No N/A 4.4 – ? Yes No N/A Vibrating tools? Yes No N/A 5.0 – Is the work planned to ensure the lowest possible exposure? Yes No N/A 5.1 – In case of high exposure: check the workplace assessment plan and risk analysis Ok N/A Working communication? Yes No N/A 6.0 – ÅtgärdIs LOTO required? Yes No N/A 7.0 – Does everyone understand the meaning? Yes No N/A Risk of landslide? Yes No N/A 8.0 – See work environment plan and risk analysis Ok N/A Demolition of load-bearing structure or hazardous material? Yes No N/A 9.0 – See Work Environment Plan and Risk Analysis Ok N/A Work near high-voltage power lines Yes No N/A 10.0 – Can the risk be eliminated? Yes No N/A 10.0.0 – View Health and Safety Plan and Risk Analysis Ok N/A Is there passing vehicle traffic? Yes No N/A 11.0 – Can the risk be eliminated? Yes No N/A 11.0.0 – Is a cordon and security guards required? Yes No N/A 11.0.0.0 – See work environment plan and risk analysis Ok N/A Anything else worth notingPossible Photos Drop files here or Select files Accepted file types: jpg, jpeg, png, pdf, heic, Max. file size: 100 MB. ParticipantsAll participants at work have reviewed and understood the risk analysis.(Required) Yes No N/A Participants – signaturesName(Required)Name clarificationDate Email – Recipients of Risk Analysis(Required)