Inspection Record – Fixed Systems Inspection record when not installed by C2 Inspection ReportLocation(Required)Date Time Hours : Minutes Created by(Required)PL number(Required)Inspection – Fixed installationsModel/manufacturerSerial number/markingType of system(Required) Scene Wire 3.0 – System Type Vertically Horizontally Sloping systems 3.0.0 – The system tilts more than 15 degrees Yes No N/A 3.0.1 – Is the clearance height okay? Yes No N/A 3.0.2 – Installed on? Wall Roast Mast 3.0.2.0 – Ladder type Steel Aluminium 3.0.2.1 – Stegpinne Round Square 3.0.2.1.0 – Diameter Yes No N/A 3.0.2.1.1 – Diameter Yes No N/A 3.0.2.2 – Fastening Concrete Steel Other 3.0.2.3 – Fastenings3.0.3 – Extension? Yes No N/A 3.0.3.0 – MeasurementsIs there a rating plate? Yes No N/A What standards does the system follow? BS EN 795 EN353 Number of users the system may be used by 1 2 3 4 5 6 7 8 When was the last inspection carried out?Total system length?Is there any installation documentation? Yes No N/A Is there a manual? Yes No N/A Is the fastening visible? Yes No N/A 11.0 – Has an ocular inspection been carried out? Yes No N/A 11.1 – Type of fastening? Expander Bumpert Steel structure Other 11.2 – Is any corrosion on the fastening acceptable? Yes No N/A 11.3 – Are the bolts tightened? Yes No N/A 11.4 – What types of installation elements have been used? Concrete Steel Other 11.5 – Number of intermediate brackets?11.5.0 – Number of corners?11.5.0.0 – Type of corner Wall Floor Thanks 11.6 – Is there documentation regarding the fixings? Yes No N/A 11.6.0 – Is this type of documentation acceptable? Yes No N/A 11.6.0.0 – Recommendation? Further investigation? Trial pull? Non-destructive testing. Are toggle clasps available? Yes No N/A GliderModelSerial numberApproved Yes No N/A Function check carried out? Yes No N/A System voltage controlled? Yes No N/A Are there any deformations in the system? Yes No N/A Has the system been subjected to corrosion? Yes No N/A All bolts checked? Yes No N/A Comment on uncaught boltsPossible courses of action?Ready to use? Yes No N/A Carried out bysignatureName clarificationDate Email – Inspection report recipients(Required)